使用说明书翻译!SETUP1.Remove banding material and tape.2.Locate pins, chain assembly, and the small parts packed in a carton attached to the floor crane.3.Remove the pump and hose assembly from the shipping carton.4.Position the legs under
来源:学生作业帮助网 编辑:六六作业网 时间:2024/11/25 17:15:19
使用说明书翻译!SETUP1.Remove banding material and tape.2.Locate pins, chain assembly, and the small parts packed in a carton attached to the floor crane.3.Remove the pump and hose assembly from the shipping carton.4.Position the legs under
使用说明书翻译!SETUP
1.Remove banding material and tape.
2.Locate pins, chain assembly, and the small parts packed in a carton attached to the floor crane.
3.Remove the pump and hose assembly from the shipping carton.
4.Position the legs under the cross member:
a.Grasp one of the legs, and remove the leg catch pin holding the leg in an upright position against the crane mast. See Figure 1.
b.Slowly swing the leg back and down, and then under the cross member.
c.Lock the leg in place by sliding the pin through the cross member and into the leg.
d.Repeat Steps 4a – 4d for the other leg.
CAUTION: Legs must be locked in place under the cross member; if the legs are not locked in place, the floor crane can tip, possibly causing personal injury.
5.Arrange the pump on the crane mast with the hose end on the bottom. Thread four 1/4 dia.x1”lg. cap screws through the pump base into the mast. See Figure 2.
6.Attach the hose to the bottom of the cylinder. Note: Seal hydraulic connections with a high quality pipe thread sealant.
CAUTION: The cylinder must be bled to remove air because air in the hydraulic system could cause a suspended load to drop unexpectedly.
7.Bleed air from the hydraulic system:
a.Remove the cylinder from the floor crane, and turn it upside down so the bleed screw is on top.
b.Loosen the bleed screw.
c.Slowly operate the pump until a clear stream of hydraulic oil(no bubbles) flows from the bleed port.
d.Tighten the bleed screw.
e.Mount the cylinder on the floor crane.
8.Hook the chain to the boom extension.
9.To move the floor crane, pull the dolly handle DOWN, and position the crane as needed. Move the dolly hangle to the UP position.
MAINTENANCE
●Maintain the hydraulic fluid according to the instructions included with the pump and cylinder. Use high-grade hydraulic oil; do NOT use brake fluid, because brake fluid can damage the internal seals of the pump and cylinder. Completely retract the cylinder before adding or replacing oil.
●Grease the wheels and pivot points on a regular maintenance schedule.
●Periodically inspect the hydraulic hose for cuts and abrasions, and replace the hose if there are signs of wear.
●To store the floor crane, slowly open the pump control valve to lower the boom to the mast. Remove the leg pins, and pull the legs out from under the cross member. Raise the legs to the mast and pin them to the leg catches.
●If the lifting action of the hydraulic system feels “spongy,” bleed air out of the cylinder as outlined in Step 7 of the setup instrucuions.
使用说明书翻译!SETUP1.Remove banding material and tape.2.Locate pins, chain assembly, and the small parts packed in a carton attached to the floor crane.3.Remove the pump and hose assembly from the shipping carton.4.Position the legs under
朋友阿,神仙也翻译不清楚你这些啊.
产品哪买的,就打电话去问问.
要不就自己琢磨怎么用.