英语翻译When was the factory opened?\x05Is the Building:Steel 0 Masonry 0 Others:Condition:AVERAGEFactory layout Comments:Good 0 Average 0 Poor 0Housekeeping\x05Good 0 Average 0 Poor 0Size of Factory:\x05 \x05Monthly total output - Factory Declar

来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/26 18:42:12
英语翻译Whenwasthefactoryopened?\x05IstheBuilding:Steel0Masonry0Others:Condition:AVERAGEFactorylayoutCom

英语翻译When was the factory opened?\x05Is the Building:Steel 0 Masonry 0 Others:Condition:AVERAGEFactory layout Comments:Good 0 Average 0 Poor 0Housekeeping\x05Good 0 Average 0 Poor 0Size of Factory:\x05 \x05Monthly total output - Factory Declar
英语翻译
When was the factory opened?\x05Is the Building:Steel 0 Masonry 0 Others:Condition:AVERAGE
Factory layout
Comments:
Good 0 Average 0 Poor 0
Housekeeping
\x05Good 0 Average 0 Poor 0
Size of Factory:
\x05 \x05Monthly total output - Factory Declared:
Approved:\x05
Pcs.
Total number of employees in this location:
a) QC’s (In-line / End-Line / Final):\x05\x05d) Production Workers:\x05
b) Total QA (i.e.Auditor):\x05\x05e) Number of Sewing Lines:\x05
c) Production Supervisors:\x05\x05f) Average Number of Sewers per line:\x05
Q A Manager available?Reports to:\x05
Does QA Manager have other responsibilities?
If yes,please clarify:
Does the factory have a generator?
Is the Quality Department independent of Production:
Factory Training:
a) Does the factory have a training scheme?
b) Do they keep Training / Skill records for each employee?
c) Does the factory have an internal or external technical training programs / courses?
d) How many operators are in the training?\x052 – 4 worker under short term training each month
What other training does the factory give their employees?\x05Not available
\x05
Initial attitude & concept of Management is:\x05Satisfactory 0 Unsatisfactory 0
Is subcontractor being used?
If yes,please give details such as Name / Address & Products / Operations:
a) Does the factory test any Material,Accessories or Finished Product?
If yes,please describe what is being tested:
Checking color by light box\x05Yes 0 No 0
b) Is there an In-house lab?If no,please list labs used for testing - If applicable:\x05Yes 0 No 0
Labs used:\x05Factory mainly use external labs for testing,they only equipped with light box for checking colors\x05
If yes,please comment on Procedure & Equipment:
\x05
c)\x05Does the factory have records of lab test results on all fabrics?\x05Yes 0 No 0
Other components\x05Yes 0 No 0
Garments \x05Yes 0 No 0
COLOR & PRINTING PREPARATION:0 Mark ( X ) if not applicable
Color sample,Lab dip,Strike-off preparation\x05Yes 0 No 0
Yarn dyed knitdown,handloom preparation\x05Yes 0 No 0
If no,please list source used:\x05
If yes,please comment on Procedure & Equipment:\x05
Documentation\x05Acceptable 0 Unacceptable 0
Laboratory recipe:\x05Acceptable 0 Unacceptable 0
Spectrophotometer:
Lead Time:
Yes 0 No 0
Light Box
If Yes,light source used:Ultralume 3000 0 D65 0 D75 0 Other:China Branded Machince
Yes 0 No 0
SAMPLING:0 Mark ( X ) if not applicable
Pattern generation:\x05Manual 0 Computerized 0
Pattern grading:\x05Manual 0 Computerized 0
Marker making:\x05Manual 0 Computerized 0
Marker duplication\x05Manual 0 Computerized 0
Does the factory have a sample making or engineering department?
If no,please indicate the vendor they use:
Yes 0 No 0
Sample made in production line\x05Yes 0 No 0

英语翻译When was the factory opened?\x05Is the Building:Steel 0 Masonry 0 Others:Condition:AVERAGEFactory layout Comments:Good 0 Average 0 Poor 0Housekeeping\x05Good 0 Average 0 Poor 0Size of Factory:\x05 \x05Monthly total output - Factory Declar
这个应该是外商验厂(服装厂)用的一个问询表,有的似乎还有答案填上了.
When was the factory opened/工厂何时开张?
Is the Building厂房类型:Steel/钢构 0 Masonry/砖石 0 Others/其它:
Condition/状况:AVERAGE/一般
Factory layout/工厂布局
Comments/评定:Good/好 0 Average/中 0 Poor/差 0
Housekeeping/厂房管理\x05Good/好 0 Average/中 0 Poor/差 0
Size of Factory/工厂规模 \x05
Monthly total output/月产量 - Factory Declared/工厂申报数:Approved/核实数:\x05 Pcs.
Total number of employees in this location/员工数量:
a) QC’s (In-line / End-Line / Final)检验员数(线上/线末/最终):\x05\x05\x05
b) Total QA (i.e.Auditor)/质保人员数:
c) Production Supervisors/领班数:
d) Production Workers/工人数:
e) Number of Sewing Lines/缝制生产线数:
f) Average Number of Sewers per line/平均每条线上缝纫机数:
QA Manager available/有否质保经理?\x05Reports to/向谁汇报:
Does QA Manager have other responsibilities/质保经理还负责其它什么业务?
If yes/如果有,please clarify/请列明:
Does the factory have a generator/工厂有自备发电机吗?
Is the Quality Department independent of Production/质量部门是独立于生产部门吗:
Factory Training/工厂培训情况:
a) Does the factory have a training scheme/工厂有培训大纲吗?
b) Do they keep Training / Skill records for each employee/工厂保存有每个员工的培训/技能记录吗?
c) Does the factory have an internal or external technical training programs / courses/工厂有进行内部或外部技术培训日程/课程吗?
d) How many operators are in the training/有多少员工在培训?2 – 4 worker under short term training each month/每月有2~4名参加短期培训
What other training does the factory give their employees/工厂还向员工提供什么其他培训?Not available/没
Initial attitude & concept of Management is/管理层的态度和想法:Satisfactory/满意0 Unsatisfactory/不满意 0
Is subcontractor being used/是否有下级供应商?
If yes,please give details such as Name / Address & Products / Operations/如果有,请具体给出如名称、地址、产品和业务范围等:
a) Does the factory test any Material,Accessories or Finished Product/工厂是否对原料、辅料或成品进行测试?
If yes,please describe what is being tested/如果是,请列明所做的测试:Checking color by light box/在灯箱下检查色度 Yes/是 0 No/否 0
b) Is there an In-house lab/厂内有否实验室?If no,please list labs used for testing/如果没有,请列明所使用的实验室 - If applicable/是否在用:\x05Yes/是 0 No/否 0
Labs used/使用的实验室:Factory mainly use external labs for testing,they only equipped with light box for checking colors/工厂主要利用外部实验室进行测试,工厂自已只是用灯箱来检查色度.\x05
If yes,please comment on Procedure & Equipment/如果是,请说明过程和所用设备:
c) Does the factory have records of lab test results on all fabrics/工厂是否保存有所有面料实验室测试的结果记录?Yes/是 0 No/否 0
Other components/其它材料\x05Yes/是 0 No/否 0
Garments/服装 \x05Yes/是 0 No/否 0
COLOR & PRINTING PREPARATION/颜色和花样:0 Mark ( X ) if not applicable/如果不做打X
Color sample,Lab dip,Strike-off preparation/色样\x05Yes/是 0 No/否 0
Yarn dyed knit down,handloom preparation/色织样/手织样\x05Yes/是 0 No/否 0
If no,please list source used/如果没有,请列出来源:\x05
If yes,please comment on Procedure & Equipment/如果是的,请列出过程和所用设备:\x05
Documentation/文件 \x05Acceptable/行 0 Unacceptable/不行 0
Laboratory recipe/实验室设置:\x05 Acceptable/行 0 Unacceptable/不行 0
Spectrophotometer/分光光度计:
Lead Time/货期:Yes/是 0 No/否 0
Light Box/灯箱
If Yes,light source used/如果用,所用的光源:Ultralume/ 3000 0 D65 0 D75 0
Other:China Branded Machince/其它中国品牌机器 Yes/是 0 No/否 0
SAMPLING/取样:0 Mark ( X ) if not applicable/如果不做打X
Pattern generation/打样:\x05Manual/手工 0 Computerized/电脑 0
Pattern grading/放样:\x05Manual/手工 0 Computerized/电脑 0
Marker making/排料:\x05Manual/手工 0 Computerized电脑/ 0
Marker duplication/下料\x05Manual/手工 0 Computerized/电脑 0
Does the factory have a sample making or engineering department/工厂有打样部门或工艺部门吗?
If no,please indicate the vendor they use/如果没有,请列明所用的供应商:Yes/是 0 No/否 0
Sample made in production line/样衣是在生产线上做的吗\x05Yes/ 是0 No/否 0

翻译好了~加分哦~
When was the factory opened? 公司什么时候开业?
Is the Building: Steel 0 Masonry 0 Others:
建筑材质是:钢制 砖石  其他
Condition: AVERAGE
条件 一般水平
Factory layout Commen...

全部展开

翻译好了~加分哦~
When was the factory opened? 公司什么时候开业?
Is the Building: Steel 0 Masonry 0 Others:
建筑材质是:钢制 砖石  其他
Condition: AVERAGE
条件 一般水平
Factory layout Comments: 公司设计评价
Good 0 Average 0 Poor 0
好一般 差
Housekeeping 客房服务
Good 0 Average 0 Poor 0
Size of Factory: 公司规模
Monthly total output - Factory Declared:
月总产量公司声明
Total number of employees in this location: 员工总数
a) QC’s (In-line / End-Line / Final):质量把关(生产线上,生产线末,最终把关)d) Production Workers:生产工人数
b) Total QA (i.e. Auditor): 质量保证师 例如核数师
e) Number of Sewing Lines:缝纫生产线数量
c) Production Supervisors: 生产监督
f) Average Number of Sewers per line:每条生产线上平均有缝纫者多少
Q A Manager available? 是否有质量保证师
Reports to: 
Does QA Manager have other responsibilities?质量保证师是否还有其他职责
If yes, please clarify: 如果有请陈述
Does the factory have a generator? 工厂是否有发电机
Is the Quality Department independent of Production: 质量检测部是否独立于生产部
Factory Training:公司培训
a) Does the factory have a training scheme? 有否有培训计划
b) Do they keep Training / Skill records for each employee? 是否对每个员工进行培训打分制
c) Does the factory have an internal or external technical training programs / courses? 工厂是否有内部或外部的技术培训项目
d) How many operators are in the training? 多少人在培训?
2 – 4 worker under short term training each month 每月的短期培训2-4人
What other training does the factory give their employees?Not available
还有什么其他培训么么有
Initial attitude & concept of Management is: 最初的态度与管理理念 
Satisfactory 0 Unsatisfactory 0
满意 不满意
Is subcontractor being used? 是否有分包商
If yes, please give details such as Name / Address & Products / Operations:如果有请详细说明:名称 地址 产品

a)Does the factory test any Material, Accessories or Finished Product?
公司是否会检测材料,配件或是最终成品
If yes, please describe what is being tested:如果有请描述检测了什么
Checking color by light boxYes 0 No 0
灯光箱检测颜色
b) Is there an In-house lab? If no, please list labs used for testing - If applicable: 是否有内部实验室如果没有请列举用于检测的实验室
Yes 0 No 0
Labs used: Factory mainly use external labs for testing, they only equipped with light box for checking colors
If yes, please comment on Procedure & Equipment:
实验室用途: 工厂主要使用外部实验室用做检测,这些实验室仅配有灯光箱来检测颜色
c)Does the factory have records of lab test results on all fabrics?Yes 0 No 0
工厂是否记录所有织物的检测结果
Other componentsYes 0 No 0
记录其他组件结果
Garments Yes 0 No 0
服装结果
COLOR & PRINTING PREPARATION: 0 Mark ( X ) if not applicable
染色及印刷设备准备 如果没有标注X
Color sample, Lab dip, Strike-off preparationYes 0 No 0
颜色样本 实验室浸泡击断准备
Yarn dyed knitdown, handloom preparationYes 0 No 0
色织手摇织机准备
If no, please list source used: 
如果没有 请列举使用的设备原料
If yes, please comment on Procedure & Equipment: 
如果有请评价程序及设备质量
DocumentationAcceptable 0 Unacceptable 0
可提供文件证明 不可提供
Laboratory recipe:Acceptable 0 Unacceptable 0
实验室配方 可提供 不可提供
Spectrophotometer:分光光度计
Lead Time: 交货期
Yes 0 No 0
Light Box 光箱
If Yes, light source used: 光源 Ultralume 3000 0 D65 0 D75 0 Other:China Branded Machince 其他中国牌子的机器
Yes 0 No 0
SAMPLING: 0 Mark ( X ) if not applicable
样本 如果不能提供标注X
Pattern generation:Manual 0 Computerized 0
图案生成 手工 电脑
Pattern grading:Manual 0 Computerized 0
质洋房吗 手工 电脑
Marker making:Manual 0 Computerized 0
打板 手工 电脑
Marker duplicationManual 0 Computerized 0
重复标记 手工 电脑
Does the factory have a sample making or engineering department?
If no, please indicate the vendor they use: 工厂是否有样品制作或是设计部门 如果没有请指出卖主使用的

Sample made in production lineYes 0 No 0
样品是否制作于生产线?

收起

英语翻译In 1917 Henry Ford purchased 1,100 acres of Dearborn,Michigan marshland along the banks of the Rouge River,land that was considered unsuitable for farming.Ford quickly transformed the site into a groundbreaking mass production vehicle fac when the boy was 英语翻译1.I was telephoning when the doorbell rang.2.The doorbell rang when I was telephoning. 英语翻译there was a general abort when the initial was discovered 根据以下的英语文章,Finding one of her students making faces at others on the playground,Ms.Smith stopped to gently reprove the child.Smiling sweetly,the Sunday School teacher said Bobby,when I was a child I was told that if I made ugly fac 英语翻译the boy was walking the street when the UFO landed(对was walking the street 提问)___ ___ the boy ___ when the UFO landed 英语翻译when was the last time?you did something for the first time? 英语翻译特别是 pulled support But the U.S.pulled its support when the Shah was overthrown 英语翻译The EGR limit was achieved when the engine reached wide-open throttle. 英语翻译they had been misled about the true value of facebook when the deal was signed when was the book published? when was the car invented when was the birthday party when was the machine produced when was the meal?意识 英语翻译1What was happening when two of the detectives opened the parcel?2What was happening when the plane arrived? 英语翻译Yes,she was born in Osaka in 1971.When she was eight,she was already a talented violinst.When she was fourteen.she toured the United States.I saw her play when I was eight. 英语翻译when i entered the room,tom was deep in his novel.和when i have entered the room,tom was deep in his novel.