英语翻译Item - No.Equipment to handleto lift Beam sizeTrolley /Chain HoistCapacityof 1 Trolley /Chain HoistLifting HeightTravellingSteering Roll Unit No.1 (roll 1-3Strip guide table with carrier rollCross cut shear no.1 with pinch rollEntry pinch
来源:学生作业帮助网 编辑:六六作业网 时间:2025/01/11 12:27:14
英语翻译Item - No.Equipment to handleto lift Beam sizeTrolley /Chain HoistCapacityof 1 Trolley /Chain HoistLifting HeightTravellingSteering Roll Unit No.1 (roll 1-3Strip guide table with carrier rollCross cut shear no.1 with pinch rollEntry pinch
英语翻译
Item - No.
Equipment to handle
to lift
Beam size
Trolley /Chain Hoist
Capacityof 1 Trolley /Chain Hoist
Lifting Height
Travelling
Steering Roll Unit No.1 (roll 1-3
Strip guide table with carrier roll
Cross cut shear no.1 with pinch roll
Entry pinch roll no.2
Flattener no.2
Deflector pinch roll no.1
英语翻译Item - No.Equipment to handleto lift Beam sizeTrolley /Chain HoistCapacityof 1 Trolley /Chain HoistLifting HeightTravellingSteering Roll Unit No.1 (roll 1-3Strip guide table with carrier rollCross cut shear no.1 with pinch rollEntry pinch
项目
设备编号需要去处理
列举
梁的尺码
拉杆/环链电动葫芦
一根拉杆/环链电动葫芦的容量
起升高度
旅游
单元一的转向辊(1-3卷
与运营商辊带钢参考表
克罗斯克特与夹送辊剪切工作日
2号入口夹送辊
拼合2号
夹送辊偏转工作日
)
项目-没有。
设备处理
把
梁大小
链条葫芦小车
能力为1小车链条葫芦
起重高度
旅行
转向卷1号机组(卷1 - 3
剥去引导表在载体卷
交叉削减剪切第一与捏卷
2进入捏卷
2 Flattener
第一卷最大导致1捏
高x长度