英语翻译1.Purpose:This document outlines the basic steps to be followed for McDonald’s toy factories’ production capacity verification.2.Application:Capacity Verification is applied only to SVP/RTQ approved factories.The verification will be

来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/23 08:31:38
英语翻译1.Purpose:ThisdocumentoutlinesthebasicstepstobefollowedforMcDonald’stoyfactories’productioncapac

英语翻译1.Purpose:This document outlines the basic steps to be followed for McDonald’s toy factories’ production capacity verification.2.Application:Capacity Verification is applied only to SVP/RTQ approved factories.The verification will be
英语翻译
1.Purpose:
This document outlines the basic steps to be followed for McDonald’s toy factories’ production
capacity verification.
2.Application:
Capacity Verification is applied only to SVP/RTQ approved factories.The verification will be conducted
annually,covering key manufacturing process including molding,decoration and assembly/pack-out.
3.Specification and Comments
3.1 Documentation/Information preparation
The factory prepares the below documentation/record/information for all in-process designs:
- Process control plan
- Tool plan (molds,decorating masks,etc.)
- BOM with components samples.
- Production schedule (include order quantity and scheduled ship date)
- Daily product reports of each critical process
- Working hour record of each critical process (machine,workers)
3.2 Design and process selection
Designs and components will be selected for the production rate verification.
- 1-2 designs out of all current running design will be selected.
- 3-5 molding components of selected designs will be audited.Recognizable parts or SVP critical
parts need to be selected prior to the audit.
- 1-2 decorating component of the selected designs will be audited.Recognizable parts need to be
selected to the audit.
- All assembly lines for selected design will be audited.

英语翻译1.Purpose:This document outlines the basic steps to be followed for McDonald’s toy factories’ production capacity verification.2.Application:Capacity Verification is applied only to SVP/RTQ approved factories.The verification will be
1.用途:
本文档概述了麦当劳的玩具工厂的生产应遵循的基本步骤
能力验证.
2.应用:
能力验证是只适用于高级副总裁/ RTQ批准的工厂.将进行核查
每年,覆盖包括成型,装饰和装配/包装出的关键制造工艺.
3.规格及评论
3.1文献/信息编制
该工厂的所有工艺设计准备下面的文件/记录/信息:
- 过程控制计划
- 工具计划(模具,装饰口罩等)
- BOM组件样品.
- 生产计划(包括订单数量和预定的出货日期)
每个关键过程 - 每日产品报告
- 工作时间记录每一个关键过程(机器,工人)
3.2设计和工艺的选择
将被选中的设计和组件的生产速率核查.
- 1-2设计出所有当前正在运行的设计将被选中.
- 3-5成型组件选定的设计将被审核.可辨认部分或SVP关键
部分需要审核之前被选中.
- 1-2装潢组件选定的设计将被审核.可辨认部分需要
选择的审计.
- 所有选定的设计的组装线将被审核.

您好!这么长的文章,您这是想“拼积木”还是……

1、目标:
这篇文档主要描绘了对应麦当劳玩具厂商产品容量验证的基本步骤。
2.应用
抱歉,太长了,有百度翻译的话,一段一段的放进去进行网络翻译吧。对应词不理解亦可以查,真的太长了。

我去百度翻译的:1。目的:本文件概述了应遵循麦当劳玩具工厂的生产能力验证的基本步骤。2。应用:能力验证是只适用于高级副总裁/ RTQ批准的工厂。验证将每年进行一次,覆盖关键制造工艺包括成型,装饰和安装/装出来的。3。规范和comments3.1文件/资料配制厂准备下面的所有制程设计/记录/信息文件:过程控制计划工具计划(模具,装饰的面具,等)BOM组件样品。-生产计划(包括订货量和预定发货日期)-...

全部展开

我去百度翻译的:1。目的:本文件概述了应遵循麦当劳玩具工厂的生产能力验证的基本步骤。2。应用:能力验证是只适用于高级副总裁/ RTQ批准的工厂。验证将每年进行一次,覆盖关键制造工艺包括成型,装饰和安装/装出来的。3。规范和comments3.1文件/资料配制厂准备下面的所有制程设计/记录/信息文件:过程控制计划工具计划(模具,装饰的面具,等)BOM组件样品。-生产计划(包括订货量和预定发货日期)-产品的每日报告的每个关键过程每个关键过程的工作时间记录(机器,工人)3.2设计过程selectiondesigns和组件将被选中的生产速率验证。1-2设计出所有当前运行的设计将被选中。-选择设计3-5成型部件将审核。可辨认部分或SVP关键部位需要选择审核前1-2装饰。选定的设计组件将被审核。可辨认部分需要选择审计。-为选定的设计组装线将审核。

收起

您好!这么长的文章yae您这是想“拼积木”还是……

英语翻译1.I got to know people by the flowers I had to remember not to cut down,by things struck in the ground on purpose or by the things lost in the grass.2.I sensed Mother communicating with this gift,a comunication I'd crand for 50 years.3.My 英语翻译For the purpose of proper using & maintainingthe kitchen scale,please read this instruction comp-eletely before operating. 英语翻译This Law is formulated for the purpose of standardizing negotiable instrument acts.整句话的翻译是? 英语翻译This article is for background purposes only and is not intended as legal advice.backgroud purpose The purpose in writing this text is? 英语翻译1.After machine construction,a thorough verification of machine precision and performance must be made.For this purpose some tests have been defined.An important result is the determination of the CNC compensation parameters for machine a 求英语翻译大神帮忙翻译下,请帮忙,大神帮忙,要对应翻译.求大神帮忙啊.1.Purpose- This guideline establishes baselinerequirements for: materials and the mechanical, electrical and environmentalperformance of DC Power Jacks and 英语翻译1.Purpose:This document outlines the basic steps to be followed for McDonald’s toy factories’ production capacity verification.2.Application:Capacity Verification is applied only to SVP/RTQ approved factories.The verification will be 英语翻译MAERSK CONTAINER INDUSTRY DONGGUAN LTD.MomoTo:Irving HultengrenFrom:Rosa Cai Cc:Morton HostupDate:Jan 21st.2010Subject:Meal allowance to canteen caterer during factory employee paid leave Purpose:The purpose of this memo is to ensure same 英语翻译是_____the purpose 的形式 英语翻译adequate enough to meet a purpose ... We have failed tomeet this year’s production _________ of 20,000 cars.A.target B.purpose C.intention D.growth为什么D不能选? won’t make margin about this order for purpose.for purpose什么意思 My _______ of this weekend’s activity is going out with some good friends.A.idea B.purpose C.mind D.thought The purpose of this problem is a primarily educational.翻译 the purpose of this passage is to explain_. ___ did he tell me his telephone number?I have no idea.A.For what purpose B.On what purpose C.For the purpose of D.On purpose he held out his first before the young man and tired to anger him ___.a.for purpose b,on purpose c.in purpose d.from purpose