英语翻译Alstom Grid LVCC supplier general information\x09\x09\x09\x09\x09\x09\x09\x09Column filled by Supplier\x091)\x09Overhead margin:\x09\x09\x09For material ordered via ALSTOM frame agreement:Phoenix,Rockwell,EATON…\x09\x09%\x09\x09\x092)\x
来源:学生作业帮助网 编辑:六六作业网 时间:2024/11/26 19:53:02
英语翻译Alstom Grid LVCC supplier general information\x09\x09\x09\x09\x09\x09\x09\x09Column filled by Supplier\x091)\x09Overhead margin:\x09\x09\x09For material ordered via ALSTOM frame agreement:Phoenix,Rockwell,EATON…\x09\x09%\x09\x09\x092)\x
英语翻译
Alstom Grid LVCC supplier general information\x09\x09\x09
\x09\x09\x09
\x09\x09Column filled by Supplier\x09
1)\x09Overhead margin:\x09\x09
\x09For material ordered via ALSTOM frame agreement:Phoenix,Rockwell,EATON…\x09\x09%
\x09\x09\x09
2)\x09Assembly,testing and modification\x09\x09
\x09Labor cost of mechanical assembly or modification (Hourly rate)\x09\x09€
\x09\x09\x09
\x09Screw or Spring-cage terminal connection + wire marking + W to W testing (UP/Wire)\x09\x09€
\x09Fast connection + wire marking + W to W testing (UP/Wire)\x09\x09€
\x09\x09\x09
\x09Functional,Dielectric,Insulation,Mechanical testing…(UP/Cubicle)\x09\x09€
\x09\x09\x09
\x09Disconnexion :all operations included (UP/Wire)\x09\x09€
\x09Reconnexion :all operations included (UP/Wire)\x09\x09€
\x09\x09\x09
3)\x09Engineering\x09\x09
\x09Daily rate\x09\x09€
\x09\x09\x09
4)\x09FAT/Commissioning at supplier's plant:\x09\x09
\x09Daily rate\x09\x09€
\x09\x09\x09
5)\x09Capacity & Tournover of supplier\x09\x09
\x09The supplier guarantees ALSTOM a maximum capacity of (Cubicles/month)\x09\x09Cubicle
\x09Type of cubicles\x09\x09Free text
\x09Supplier's annual tournover\x09\x09€
\x09\x09\x09
6)\x09Language\x09\x09
\x09The supplier can reply RfQs in (English,French,German,Russian…)\x09\x09Language
\x09\x09\x09
7)\x09For 2M€ > annual turnover (TO) >=1M€,end-year-rabate of turnover (TO)\x09\x09% of TO
\x09For 5M€ > annual turnover (TO) >=2M€,end-year-rabate of turnover (TO)\x09\x09% of TO
\x09For annual turnover (TO) >=5M€,end-year-rabate of turnover (TO)\x09\x09% of TO
\x09\x09\x09
8)\x09Price optimisation and other proposals.\x09\x09
\x09\x09\x09Free text
英语翻译Alstom Grid LVCC supplier general information\x09\x09\x09\x09\x09\x09\x09\x09Column filled by Supplier\x091)\x09Overhead margin:\x09\x09\x09For material ordered via ALSTOM frame agreement:Phoenix,Rockwell,EATON…\x09\x09%\x09\x09\x092)\x
Alstom输电网LVCC供应商总体信息
由供应商填写的列
1) 企业经费保证金:对通过Alstom共同协议(商业用语)订购的材料:Phoenix(凤凰),Rockwell(罗克
韦尔),Eaton(伊顿).
2)装配,测试与修改:机械装配与修改的劳力费用.(按每小时计算)
螺钉或弹簧笼的最终连接+电线制造+ W to W测试(估计是专有名词)(UP/Wire)
快速连接+电线制造+ W to W测试(估计是专有名词)(UP/Wire)
功能性,诱电性,绝缘,机械测试(UP/Wire)
断开连接:包括所有作业(UP/Wire)
重新连接:包括所有作业(UP/Wire)
3)工程:每日费用
4)FAT/在供应商的工厂进行调试:每日费用
5)供应商的承受能力与印业额(原稿打错了:turnover)
供应商向ALSTOM保证一个机柜的最大承受能力(机柜/个月)
机柜
种类 其他
供应商的营业额
6)语言
供应商可以用流利的(英语,法语,德语,俄语)回复问题
语言种类:
7)2百万英镑> 年度营业额 (TO) >=1百万英镑,年终营业额回扣 (TO)\x05\x05% of TO
5百万英镑> 年度营业额 (TO) >=2M€,end-year-rabate of turnover (TO)\x05\x05% of TO
年度营业额 (TO) >=5M€,end-year-rabate of turnover (TO)\x05\x05 % of TO
8)价格最大化及其他提议
其他
请问这是要做商业企划吗,我这门课的报告刚刚写完.