英语翻译安装说明:1.安装支架1用M12X50 六角头螺钉.2.安装轨道2;3;4,注意宽度316MM.电机轨道与尾轮轨道都有左右之分,一边有换向撞块槽,另一边没有.站在电机一端看撞块在右端,如图.3.安装
来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/29 09:54:10
英语翻译安装说明:1.安装支架1用M12X50 六角头螺钉.2.安装轨道2;3;4,注意宽度316MM.电机轨道与尾轮轨道都有左右之分,一边有换向撞块槽,另一边没有.站在电机一端看撞块在右端,如图.3.安装
英语翻译
安装说明:
1.安装支架1用M12X50 六角头螺钉.
2.安装轨道2;3;4,注意宽度316MM.电机轨道与尾轮轨道都有左右之分,一边有换向撞块槽,另一边没有.站在电机一端看撞块在右端,如图.
3.安装电机5,电机档头6,换向撞块的一边低一边高,如图,把主机吹口7装入主机,在已装好的轨道上放主机8,不锈钢门的一边向尾轮,安装尾轮挡头10,安装尾轮11,换向撞块的一边低向一边高,如图.安装换向撞块9,注意撞块与拔叉的位置到位和准确.
4.安装外吸棉部位12;13;14;15;16;17,注意14滑杆上的橡胶板与90PVC管平面接触处安装平整密封,90PVC管处于主机110孔的中间位置.
5.安装吹吸风管部位,安装18;19;20;21;22;23;24;26;29;30.安装好后把支撑臂25的一端装入主机一端与其连接,PVC吹吸管与主机吹吸管用软波纹管27,110直接同31连接,用喉箍28夹紧.
6.安装传动带32
英语翻译安装说明:1.安装支架1用M12X50 六角头螺钉.2.安装轨道2;3;4,注意宽度316MM.电机轨道与尾轮轨道都有左右之分,一边有换向撞块槽,另一边没有.站在电机一端看撞块在右端,如图.3.安装
Installation instructions:
1.M12X50 mounting bracket with a hexagonal head screws.
2.Installation of track 2,3,4,attention to the width 316 MM.Motor orbit round the track and there around the end of the points,while the other hit a block slot,the other side does not.Motor see from one end of the block hit the right end,the figure.
3.Installation of the electrical 5,the electrical header 6,block-to hit the side of the low side,figure,the host 7 mouth blown into host,have installed a good track-8 host,stainless steel door to the side of the end of round ,The first installation of the end of the block 10,installed last round 11,hit the block for the low side to side,Figure.To install collision-for-9 block,block and hit the attention of the location of fork in place and accurate.
4.Installation of suction cotton site 12; 13; 14; 15; 16; 17,14 slider attention on the rubber plate and 90 PVC pipe contact with the plane formation installed seal,90 PVC pipe in a 110-host the middle.
5.Installation of the wind blowing suction tube parts,installing 18; 19; 20; 21; 22; 23 24 26 29 30.Installed after the support arm 25 into one end of connecting with the host side,PVC winds blowing straw and the host of soft straw with bellows 27,110 directly connected with 31,with 28 jets hoop clamping.
6.Belts installed 32