英语翻译The contractor shall prior to the commencement of any work on site insure in the joint name of the contractor and the owner against its liability for any loss,damage,death or injury which may occur to any property or to any person by or a

来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/25 08:57:32
英语翻译Thecontractorshallpriortothecommencementofanyworkonsiteinsureinthejointnameofthecontractorandthe

英语翻译The contractor shall prior to the commencement of any work on site insure in the joint name of the contractor and the owner against its liability for any loss,damage,death or injury which may occur to any property or to any person by or a
英语翻译
The contractor shall prior to the commencement of any work on site insure in the joint name of the contractor and the owner against its liability for any loss,damage,death or injury which may occur to any property or to any person by or arising out of the execution of the contract.

英语翻译The contractor shall prior to the commencement of any work on site insure in the joint name of the contractor and the owner against its liability for any loss,damage,death or injury which may occur to any property or to any person by or a
主干部分是:The contractor shall insure against its liability.
insure against 给……保险以防
所以against 翻译成 以防
全部翻译为:承包商在工地现场工作之前,应该和业主联名保证,要承担合同生效后可能发生的损失、破坏、死亡或受伤以及对财产或人身的伤害.

违反, against its liability for any loss 违反责任而造成的损失

可以把句子看成The contractor shall . . . insure in the joint name of the contractor and the owner against its (contractor's) liability for . . . against没有单独的意思· 是insure . . . against这个词组· 就是说承包商要给后面那些个损失啊伤害啊...

全部展开

可以把句子看成The contractor shall . . . insure in the joint name of the contractor and the owner against its (contractor's) liability for . . . against没有单独的意思· 是insure . . . against这个词组· 就是说承包商要给后面那些个损失啊伤害啊死亡啊做保险 受益人么是承包商和物主的联名

收起

what's the army contractor mean? 英语翻译The Contractor shall not be claim commission if and when the execution of the business concluded became impossible,whereas the impossibility is beyond JOP’s control.The Contractor has to refund payments to the CUSTOMER subsequently rega 英语翻译The Contractor shall be fully resonsible for the Plant,the Contractor's equipment and any other materials or equipment he intends to use for the carrying out of the Works. 英语翻译Owner / Owner’s Representative reserves the right to restrict the sue of Owner’s information to specific locations,by specified Contractor personnel,or under other such use restrictions and to require any Contractor key personnel or a 英语翻译The available capital is calculated by adding any financial sponsorships added to the net asset value of a contractor as indicated in the contractor’s financial statements,subject to the contribution make by financial sponsorships to av 英语翻译The performance security shall be reduced to ten percent (10%) of the value of the component covered by the extended defect liability to cover the Contractor’s extended defect liability in accordance with the provision in the PC,pursuan 英语翻译20% of the Contract Price equal to [USD 6,320.000] shall be paid to the Contractor on the date of Contract’s signature against a bank guarantee (advance payment bond) of the same value to be submitted by the Contractor to the Owner with 英语翻译To the extent that an underestimate or overestimate is caused by changes in the quantities of work,neither error will effect the contractor’s profit beyond the markup in the unit prices. 英语翻译For the down payments and payments of advance(s),the Contractor shall establish unconditional Bank Guarantees acceptable to the Owner from first class International bank operating in India and in favour of the Owner in the same amount whi 英语翻译Policies and certificates for insurance shall be delivered by the Contractor to the Engineer for the Engineer’s approval before the Start Date.All such insurance shall provide for compensation to be payable in the types and proportions 英语翻译shop drawing work is out of scope of thecontractor.however,if the fabrication drawings shownin appendix 8-4 as a sample are not sufficient for the contractor's fabricationwork,thecontractor shall consider the cost of further detail drawin 英语翻译These are the as-built surveys and they are used to check the contractor `s work and show locations of structures and their components ( water line ,sewer ,etc .) ,which will be needed for future maintenance ,changes ,and new construction 英语翻译是最后的一个从句.全句是:10% upon expiry of warranty period,however,redeemable after complete delivery and contractor's presentation of the bank guarantee in accordance with Annex 2 of the contract as far as not presented for 英语翻译China will provide accommodation and meals to CONTRACTOR's personnel while the personnel are on their '30 days on' work rotation at the field WORK SITES.请尽量保证翻译完整,有道,谷歌,百度翻译的可以走人, 英语翻译Dayworks are varied work inputs subject to payment on a time basis for the Contractor's employees and Equipment,in addition to payment for associated Materials and Plant 英语翻译RT最好把下面一段也翻译:Quality controls at sub-vendor plant will be witnessed by Contractor and by Vendor,following the same requirements and procedures defined for others inspections at vendor’s workshops and strictly followi 英语翻译Shipping is an area where great care needs to be taken.Exhibitions can avoid high shipping and drayage costs with assistance from operation managers.Encourage exhibitors to ship to the general contractor's warehouse in advance---especiall In the case of Contractor's complete adherence and without negligence to such loss or damage求译?