英语翻译The vessel will discharge at one safe port,one safe berth,always afloat alwaysaccessible where Buyer’s guarantee a safe arrival draft of mini 12 meters salt water,without any LOA or beam limitation.
来源:学生作业帮助网 编辑:六六作业网 时间:2024/11/06 03:52:03
英语翻译Thevesselwilldischargeatonesafeport,onesafeberth,alwaysafloatalwaysaccessiblewhereBuyer’sguarant
英语翻译The vessel will discharge at one safe port,one safe berth,always afloat alwaysaccessible where Buyer’s guarantee a safe arrival draft of mini 12 meters salt water,without any LOA or beam limitation.
英语翻译
The vessel will discharge at one safe port,one safe berth,always afloat always
accessible where Buyer’s guarantee a safe arrival draft of mini 12 meters salt water,
without any LOA or beam limitation.
英语翻译The vessel will discharge at one safe port,one safe berth,always afloat alwaysaccessible where Buyer’s guarantee a safe arrival draft of mini 12 meters salt water,without any LOA or beam limitation.
这是一份合同吧.
翻译如下:
【货船会在一个安全的港口(安全的停泊点)卸货.货船停泊处应由买家提供.停泊处要求有不低于12米的吃水线(海水),也不能有船长和船梁方面的限制.】
英语翻译thank you we will draw boats from Vietnam and the vessel will inform the location and date you will move out of the ship.ok
英语翻译Should the seller substitute the performing vessel,a vessel nomination to the Buyer will be sent,informing the details of vessel,ETA loading port and so on.Buyer should confirm its acceptance or rejection to the Seller within 1 days after
英语翻译其中“loaded on board the vessel”怎么翻译?
英语翻译We will suspend shipping service for etd 10.13,and after National day the first vessel etd 10.20 any deadline time as before.pls note all supplier thanks.
英语翻译1.The vessel will be now “DS ABILITY” sailing on May/25 here,i/o “FPMC CONTAINER 7” sailing on May/18,because of delay of contract’s conclusion,please reconfirm.2.“Cert.of the place of Origin” will be stated the vessel of
英语翻译Customers/Agents:any changes/amendments to the FI (ie Changes toConsignee or Port of Discharge ) made after vessel departs will incurpenalties which will be passed on to the Customer/Consignee.
英语翻译If the vessel sailed on 01/01/2012,the vessel should l be arrived at Port Klang via tomorrow.Please take note,any charges incurred if any,due to late receive of the shipping documents for clearance purpose will be charged to your company.
英语翻译Pumping direction reversed:upward in centre of the vessel(along the axis ).
特别是那个a vessel that is not coveredSeafarers who have earned ESG prior to joining a vessel that is not covered will retain their ESG earned while serving on board the vessel that is not covered
英语翻译Effective immdy,in case if a feeder vessel or mother vessel will be delayed 2 or more days fm the ETD originsentered into gbspo,and origin has already received notice fm carrier as attached sample,pls continue to forward it to yr IPOC so
laden on board the vessel
英语翻译The vessel will discharge at one safe port,one safe berth,always afloat alwaysaccessible where Buyer’s guarantee a safe arrival draft of mini 12 meters salt water,without any LOA or beam limitation.
the departure of the vessel to open
the departure of the vessel to open
英语翻译the rudder is to be held to avoid allowing the vessel's head in a turn .
英语翻译PLEASE SHOW THE NAME,ADDRESS/TEL NO.OF CARRYING VESSEL'S AGENT AT THE PORT OF DESTINATION
英语翻译This specification sets forth the requirements for a diesel motor powered bulk cargo vessel.The Builder of the vessel should perform all work and details connected therewith which may be required to design,construct,equip,outfit,test and
英语翻译Equipmentfor cargoTwo (2) heavy lift cranes (SWL 900 t each)will be installed on the starboard side of the vessel as shown on the generalarrangement plan (GAP) and shall be Owner’s supply.Upper deck hatch coversshall be of box folding t