英语翻译The cycle in Fig.ib determines the workpiece base surface position in the direction of the axis Z of the spindle relative to the 'zero" position of machine tool Z 0.The final bas- ing of workpiece on the machine is achieved by locating th

来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/20 16:09:35
英语翻译ThecycleinFig.ibdeterminestheworkpiecebasesurfacepositioninthedirectionoftheaxisZofthespindlerel

英语翻译The cycle in Fig.ib determines the workpiece base surface position in the direction of the axis Z of the spindle relative to the 'zero" position of machine tool Z 0.The final bas- ing of workpiece on the machine is achieved by locating th
英语翻译
The cycle in Fig.ib determines the workpiece base surface position in the direction of the axis Z of the spindle relative to the 'zero" position of machine tool Z 0.The final bas- ing of workpiece on the machine is achieved by locating the position of the base surfaces relative to the "zero"position of the machine in the direction of X and Y axes (see Fig.ic).
Two additional cycles of workpiece basing with respect to a hole or cylindrical pin are required for workpieces having an axis of symmetry as the base.The adjustment with reference to the hole is made with four points (Fig.id).As a result,the NC device deter- mines the hole axis in directions X and Y and calculates coordinates X 0 and Y0 and then stores these values.The cycle of adjustment with reference to the cylindrical pin differs in that it is necessary to introduce the path of safe circumvention of the surface (see Fig.le).

英语翻译The cycle in Fig.ib determines the workpiece base surface position in the direction of the axis Z of the spindle relative to the 'zero" position of machine tool Z 0.The final bas- ing of workpiece on the machine is achieved by locating th
这个循环Fig.ib决定了工件表面位置的基地方向轴,Z的主轴相对于!' 0”位置的机床Z 0.最后bas - ing的工件对机器的获得是通过定位基地表面的位置相对于“0”的位置的方向机在X轴和Y轴(见Fig.ic).
以两个额外的周期的工件对圆柱销孔或工件所需有一个对称轴为本.调整,参照这个洞是由Fig.以4分(id).作为结果,数控装置阻止-射孔轴线方向,矿山的X和Y坐标X为0,并计算Y0然后商店这些价值观.这个循环的调整,参照筒形销的区别在于有必要引入路径的安全诈骗的表面(见Fig.乐).
;用有道词典啦;

我不懂

这个循环Fig. ib决定了工件表面位置的基地方向轴,Z的主轴相对于! ' 0”位置的机床Z 0。最后bas - ing的工件对机器的获得是通过定位基地表面的位置相对于“0”的位置的方向机在X轴和Y轴(见Fig. ic)。
以两个额外的周期的工件对圆柱销孔或工件所需有一个对称轴为本。调整,参照这个洞是由Fig.以4分(id)。作为结果,数控装置阻止-射孔轴线方向,矿山的X和Y坐标X为0,并...

全部展开

这个循环Fig. ib决定了工件表面位置的基地方向轴,Z的主轴相对于! ' 0”位置的机床Z 0。最后bas - ing的工件对机器的获得是通过定位基地表面的位置相对于“0”的位置的方向机在X轴和Y轴(见Fig. ic)。
以两个额外的周期的工件对圆柱销孔或工件所需有一个对称轴为本。调整,参照这个洞是由Fig.以4分(id)。作为结果,数控装置阻止-射孔轴线方向,矿山的X和Y坐标X为0,并计算Y0然后商店这些价值观。这个循环的调整,参照筒形销的区别在于有必要引入路径的安全诈骗的表面(见Fig.乐)。
大概就是这样了!!

收起

英语翻译The cycle in Fig.ib determines the workpiece base surface position in the direction of the axis Z of the spindle relative to the 'zero position of machine tool Z 0.The final bas- ing of workpiece on the machine is achieved by locating th 英语翻译FIG.2 illustrates a crosssectional view of the packaged IC of FIG.1 at a stage in processing inaccordance with one embodiment of the present disclosure. 英语翻译Hydraulic oil TemperatureThe temperature of hydraulic oil must be maintained at aproper temperature to keep the moulding cycle timeconstant.The ideal temperature is 45℃.Adjust thetemperature control valve (Fig.2-2 3 ) to keep the oiltem 英语翻译Hydraulic oil TemperatureThe temperature of hydraulic oil must be maintained at aproper temperature to keep the moulding cycle timeconstant.The ideal temperature is 45℃.Adjust thetemperature control valve (Fig.2-2 3 ) to keep the oiltem 英语翻译Life cycle cost (LCC) as a tool for improving sustainability in the Norwegianfishing fleet 问一句英语翻译:the data from two-class categories with a Gaussian distribution are shown in Fig.1 英语翻译Experimental results for the magnetic coupling can be seenin Fig.10 where both the load disturbance and torsion angleerrors are corrected for a load-side set-point position-referenced system.Although the results shown in Fig.10 show fast 英语翻译The development of pig embryos originatingfrom enucleolated oocytes arrested after afew cleavages (Table 1 and Fig.3A).In contrast,embryos from sham-operated oocytesdeveloped to blastocysts with detectable nucleoli(fig.S8,Pig).The cleavag 英语翻译The thermal stability tests for stainless steel support after anodic oxidation process is reported in Fig.3.The microphotographs in Fig.3 show an obvious difference as compared with in Fig.2.It is worth noting,the abnormity and multiangul 英语翻译The typical inventory cycle begins with an unexpected reduction in demand whichleaves firms with inventory above their desired levels. 英语翻译This great degradation of temperature needed to evaporate the steam,results in a poor power plant cycle efficiency,because high cycle efficiencies are only achieved by increasing the evaporation temperature.In contrast to this,organic flu 英语翻译The constant value of qm is obtained from the slope of linear plot of 1/qe versus 1/Ce as shown in Fig.2. 英语翻译Assad earlier said that Camp David was the final striptease in which the Israelis won`t even leave him with a fig leaf. 英语翻译in fig .1-7c all voltages are marked in the -to+sense in going clockwise around the loop.the voltmeters are connected as shown in fig.1-7d to measure voltages u'1,u'2and u'3.nothing that the voltmeter readings are the same as the variable 英语翻译there is strong evidence of similar solutions to the functional constraints imposed by hosts evolving independently in different fig wasp(榕小蜂) lineages. 英语翻译To implement the relational model for the same partial LIMS schema presented in Fig.1 for the hierarchical model,tables would need to be created for each entity relationship in the schema.Fig.3 shows the mapping required in the relational 英语翻译A plan of the panel P-31 of seam no.lA of GDK-SA incline is shown in Fig.1.A three dimensional view and plan view of the model showing grid pattern in and around the seam and panel is shown in Fig.2a and b,respectively.Modelling results,i 英语翻译Export consumers and major retailers in the world are requiring growers to record all chemical inputs during the growing cycle.