In order to inspect the electric fittings in the foundation remove ametal plate from the ground platform and go down into the foundation.
2.1.1water entry
inspect the foundation for traces of water entry in case of stagnant water ,this must be removedimmediately.Renewed water entry must beprevented by re-sealing the joint between the lower tower segment and the foundation ring from the outside.
2.1.2lines,cables,and cable connections
visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion.Missing wear or edge protecion must be refitted,if required,or correctly positioned.
2.1.3Potential equalization
Inspect the terminals of the ground cable for tight fit.Visually inspect the potential equalization rail for corrosion .If the rail is damaged severely,it mustbe replaced.
2.2Tower bottom/tower body
2.2.1Lines,cables,and cable connections
Visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion .Missing wear or edge protection must be refitte,if required,or correctly positioned.The cables in the tower body must be tightened and must not sag.
2.2.2Cable support
Inspect the tight assembly of the cable support and the tight fit of the cables in the supports.
2.2.3Sockets
Check the shockproof and the CEE sockets for funcion ,using a gauge.
2.2.4Tower lighting/emergency lighting
Check the tower lighting for function by switching it on.Replace defect luminaries.
Check the function of the emergency lighting in the tower and the nacelle by simulating a power failure,e.g.byactivating the fuses in the tower bottom.The emergency lighting must illuminate automatically.If required,the test switches located on the lamps can be turned on.
2.2.5Terminal points
CAUTION
230V AC/400V AC/690V AC Before the screw connections are inspected,the cable harness in the transformer substation must be disconnected.In addition,use insulated tools.
The screw connections in the terminal and connection cabinets are visually inspected and checked for tight fit.Tighten the nuts if required.(Refer to 2.3.3for torques)
可能出自某篇关于能源的论文,俺一直在网上没找到。
PS.单词都很认真的查过,如果有大神想翻译不会的词俺可以逐个解释。
用翻译器的童鞋们。也太不认真了吧。

英语翻译2.1foundationIn order to inspect the electric fittings in the foundation remove ametal plate from the ground platform and go down into the foundation.2.1.1water entryinspect the foundation for traces of water entry in case of stagnant wat
2.1foundation
In order to inspect the electric fittings in the foundation remove a metal plate from the ground platform and go down into the foundation.
2.1 地基
要检查地基的电气配件,移开地面平台的一块铁板,就可进入地基内部.
2.1.1water entry
inspect the foundation for traces of water entry in case of stagnant water ,this must be removed immediately.Renewed water entry must be prevented by re-sealing the joint between the lower tower segment and the foundation ring from the outside.
2.1.1 渗水
如发现积水,应检查渗水痕迹并即刻处理.为了避免再渗水,必须对底层塔区与底圈外部之间的接合处重新进行密封处理.
2.1.2lines,cables,and cable connections
visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion.Missing wear or edge protection must be refitted,if required,or correctly positioned.
2.1.2 电线、电缆及电缆连接器
以肉眼检查所有的电线、电缆及电缆连接器是否有破损与腐蚀.遗失的仪器或边角保护,如有需要必须重新装上或正确地放置.
2.1.3Potential equalization
Inspect the terminals of the ground cable for tight fit.Visually inspect the potential equalization rail for corrosion .If the rail is damaged severely,it must be replaced.
2.1.3 电位均衡
检查接地电缆的终端头确保紧密配合.肉眼检查电位钢轨是否被腐蚀.如果钢轨损坏严重,必须更换.
2.2Tower bottom/tower body
2.2 塔底/塔体
2.2.1Lines,cables,and cable connections
Visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion .Missing wear or edge protection must be refitte,if required,or correctly positioned.The cables in the tower body must be tightened and must not sag.
2.2.1电线、电缆及电缆连接器
以肉眼检查所有的电线、电缆及电缆连接器是否有破损与腐蚀.遗失的仪器或边角保护,如有需要必须重新装上或正确地放置.塔体的电缆必须紧固,不可松弛下陷.
2.2.2Cable support
Inspect the tight assembly of the cable support and the tight fit of the cables in the supports.
2.2.2 电缆托架
检查确保电缆托架组件的紧固,以及托架上电缆的紧固配合.
2.2.3 Sockets
Check the shockproof and the CEE sockets for function,using a gauge.
2.2.3 插座
使用测量仪器检查抗电击及CEE插座的有效性.
2.2.4Tower lighting/emergency lighting
Check the tower lighting for function by switching it on.Replace defect luminaries.
Check the function of the emergency lighting in the tower and the nacelle by simulating a power failure,e.g.by activating the fuses in the tower bottom.The emergency lighting must illuminate automatically.If required,the test switches located on the lamps can be turned on.
2.2.4 塔的照明/应急照明
打开塔的照明灯以检查其有效性.更换已失效的照明灯具.
通过模拟电源故障来检查塔及导流罩短舱内的应急照明的有效性;例如启动塔底的保险丝.应急灯必须能够自动照明,如有需要,可以打开灯具上的测试开关.
2.2.5Terminal points
CAUTION
230V AC/400V AC/690V AC Before the screw connections are inspected,the cable harness in the transformer substation must be disconnected.In addition,use insulated tools.
The screw connections in the terminal and connection cabinets are visually inspected and checked for tight fit.Tighten the nuts if required.(Refer to 2.3.3for torques)
2.2.5 接线柱
警告230V AC / 400V AC / 690V AC
检查螺旋接头前,必须预先断开变电站的电缆束.另外,必须使用绝缘工具.
肉眼检查接线柱及接线柜的螺旋接头是否紧固;如有需要,拧紧螺帽.(扭矩力度请参考2.3.3)
【英语牛人团】

2.1foundation
为了检查电器配件的基础上拆卸ametal板从地上平台、下到扶轮基金会。
2.1.1water入口
检查基础的入水痕迹时,这一定是死水removedimmediately。更新入水beprevented必须由re-sealing关节之间的基础环节和塔声从外面。
2.1.2lines、电缆,电缆连接,
目视检查所有...

全部展开

2.1foundation
为了检查电器配件的基础上拆卸ametal板从地上平台、下到扶轮基金会。
2.1.1water入口
检查基础的入水痕迹时,这一定是死水removedimmediately。更新入水beprevented必须由re-sealing关节之间的基础环节和塔声从外面。
2.1.2lines、电缆,电缆连接,
目视检查所有的线条,电缆,电缆连接的基础上对损坏和腐蚀失踪的磨损或边缘,区内无污染源企业必须改装,如果必要的话,或者正确定位。
2.1.3Potential均衡。
检查的地面电缆终端紧配合目视检查潜在的均衡为铁路腐蚀;铁路损坏严重,它必须更换。
2.2Tower底/塔体
2.2.1Lines、电缆,电缆连接,
目视检查所有的线条,电缆,电缆连接在一起的基础.Missing磨损或损坏和腐蚀防护必须refitte边缘,如果必要,或者正确定位电缆塔体必须拧紧,千万不要凹陷。
2.2.2Cable支持
检查紧装配电缆的支持和紧身的电缆的支持。
2.2.3Sockets
检查防震、考试funcion插座,使用一个表。
2.2.4Tower照明、应急照明
检查塔照明功能转换。更换缺陷。
检查应急照明系统的功能及实现塔由模拟断电,e.g.byactivating熔断器在塔的底部。紧急照明要照亮自动如果需要,测试开关(香港)有限公司座落在灯可开启。
2.2.5Terminal分
注意
伏交流电(AC / 690V交流400V之前,螺杆连接的电缆线束在变电站必须断开连接。此外,用绝缘工具。
螺杆连接终端连接柜外观检验和检查紧配合如果需要紧固螺母。(参阅2.3.3for扭矩

收起

为了检查电器配件的基础上拆卸板从地上平台、下到扶轮基金会。
2.1.1入口
检查基础的入水痕迹时,这一定是死水。更新入水必须由关节之间的基础环节和塔声从外面。
2.1.2电缆,电缆连接,
目视检查所有的线条,电缆,电缆连接的基础上对损坏和腐蚀失踪的磨损或边缘,区内无污染源企业必须改装,如果必要的话,或者正确定位。
2.1.3均衡。

全部展开

为了检查电器配件的基础上拆卸板从地上平台、下到扶轮基金会。
2.1.1入口
检查基础的入水痕迹时,这一定是死水。更新入水必须由关节之间的基础环节和塔声从外面。
2.1.2电缆,电缆连接,
目视检查所有的线条,电缆,电缆连接的基础上对损坏和腐蚀失踪的磨损或边缘,区内无污染源企业必须改装,如果必要的话,或者正确定位。
2.1.3均衡。
检查的地面电缆终端紧配合目视检查潜在的均衡为铁路腐蚀;铁路损坏严重,它必须更换。
2.2底/塔体
2.2.1电缆,电缆连接,
目视检查所有的线条,电缆,电缆连接在一起的基础.磨损或损坏和腐蚀防护必须边缘,如果必要,或者正确定位电缆塔体必须拧紧,千万不要凹陷。
2.2.2支持
检查紧装配电缆的支持和紧身的电缆的支持。
2.2.3检查防震、考试插座,使用一个表。
2.2.4照明、应急照明
检查塔照明功能转换。更换缺陷。
检查应急照明系统的功能及实现塔由模拟断电,e.g.byactivating熔断器在塔的底部。紧急照明要照亮自动如果需要,测试开关(香港)有限公司座落在灯可开启。
2.2.注意
伏交流电(AC / 690V交流400V之前,螺杆连接的电缆线束在变电站必须断开连接。此外,用绝缘工具。
螺杆连接终端连接柜外观检验和检查紧配合如果需要紧固螺母。(参阅2.3.3扭矩)。

收起

2.1foundation
为了考察的基础上的电动装置除去地面平台ametal板,进入了基础。
2.1.1water条目
检查的入水痕迹积水情况的基础上,这一定是removedimmediately。重新入水必须beprevented通过重新之间的密封下塔段和从外面地基环联合。
2.1.2lines,电缆和电缆连接
视力检查所有管道,电缆,在基础和磨损或损坏...

全部展开

2.1foundation
为了考察的基础上的电动装置除去地面平台ametal板,进入了基础。
2.1.1water条目
检查的入水痕迹积水情况的基础上,这一定是removedimmediately。重新入水必须beprevented通过重新之间的密封下塔段和从外面地基环联合。
2.1.2lines,电缆和电缆连接
视力检查所有管道,电缆,在基础和磨损或损坏和corrosion.Missing边缘protecion电缆连接必须改装,如果需要,或正确定位。
2.1.3Potential均衡
检查是否有严格fit.Visually检查腐蚀电位均衡铁路地面电缆终端。如铁路受损严重,它mustbe取代。
2.2Tower底部/塔体
2.2.1Lines,电缆和电缆连接
目视检查所有线路,电缆,并在基础的损害和腐蚀电缆连接。磨损或丢失,必须refitte边缘保护,如果需要,或在塔体正确positioned.The电缆必须拧紧,不能下垂。
2.2.2Cable支持
检查电缆的支持,在支持电缆紧配合紧装配。
2.2.3Sockets
检查funcion防震和中东欧的插座,使用规范。
2.2.4Tower照明/应急照明
检查通过切换它的功能塔照明。替换缺损灯具。
检查在塔紧急照明和通过模拟电源故障时,在塔的底部egbyactivating保险丝机舱功能。应急照明,必须阐明automatically.If要求,测试交换机上的灯可以打开位置。
2.2.5Terminal点
注意
230伏AC/400V AC/690V螺丝连接的交流之前进行检查,在变电站电缆线束必须断开。此外,使用绝缘工具。
在终端和连接螺丝连接的橱柜是目视检查,检查的紧张fit.Tighten坚果如果需要的话。(参考2.3.3for力矩)

收起

2.1基础
为了考察的基础上的电动装置除去地面平台ametal板,进入了基础。
2.1.1入水
检查的入水痕迹积水情况的基础上,这一定是removedimmediately。重新入水必须beprevented通过重新之间的密封下塔段和从外面地基环联合。
2.1.2管道,电缆和电缆连接
视力检查所有管道,电缆,在基础和磨损或损坏和corrosion.Missi...

全部展开

2.1基础
为了考察的基础上的电动装置除去地面平台ametal板,进入了基础。
2.1.1入水
检查的入水痕迹积水情况的基础上,这一定是removedimmediately。重新入水必须beprevented通过重新之间的密封下塔段和从外面地基环联合。
2.1.2管道,电缆和电缆连接
视力检查所有管道,电缆,在基础和磨损或损坏和corrosion.Missing边缘protecion电缆连接必须改装,如果需要,或正确定位。
2.1.3电位均衡
检查是否有严格fit.Visually检查腐蚀电位均衡铁路地面电缆终端。如铁路受损严重,它mustbe取代。
2.2塔底/塔体
2.2.1管道,电缆和电缆连接
目视检查所有线路,电缆,并在基础的损害和腐蚀电缆连接。磨损或丢失,必须refitte边缘保护,如果需要,或在塔体正确positioned.The电缆必须拧紧,不能下垂。
2.2.2电缆支持
检查电缆的支持,在支持电缆紧配合紧装配。
2.2.3插座
检查funcion防震和中东欧的插座,使用规范。
2.2.4塔照明装置/紧急照明
检查通过切换它的功能塔照明。替换缺损灯具。
检查在塔紧急照明和通过模拟电源故障时,在塔的底部egbyactivating保险丝机舱功能。应急照明,必须阐明automatically.If要求,测试交换机上的灯可以打开位置。
2.2.5终点
注意
230伏AC/400V AC/690V螺丝连接的交流之前进行检查,在变电站电缆线束必须断开。此外,使用绝缘工具。
在终端和连接螺丝连接的橱柜是目视检查,检查的紧张fit.Tighten坚果如果需要的话。(参考2.3.3for力矩)

收起