英语翻译Following up on the reports you issued based on complaints received from your customer of locomotive workshops,ACKE Electric has set up a series of actions with the scope of:1.Impose controls during of the different phase of the coil wind
来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/19 09:27:23
英语翻译Following up on the reports you issued based on complaints received from your customer of locomotive workshops,ACKE Electric has set up a series of actions with the scope of:1.Impose controls during of the different phase of the coil wind
英语翻译
Following up on the reports you issued based on complaints received from your customer of locomotive workshops,ACKE Electric has set up a series of actions with the scope of:
1.Impose controls during of the different phase of the coil winding to check the exact respect of the coil wire tension and rotation speed of the coil spool.Particular attention has also been enforced during the tin soldering operations and include a control for the correct temperature of the welders.
2.Potentiate the controls of the coil resistance measurement of the coil itself once the coil winding is complete so that it is extended to each single piece made.This is made in addition to the final factory testing on each contactor after complete assembly.
3.Specific personnel training for the handling and storing of these coils in the stock room and giving particular care to stock them in an orderly way to avoid blows or excessive load conditions due to stacking coils in layers in the same bin.The coils will be placed in single layers and each coil well divided from the other to avoid blows during handling and/or transport.
It has also been establish to immediately isolate any coils which may have been drop or receive blows during the handling,in a controlled way for additional controls or reject.
4.Conduct regular audits of the production process of the bridge rectifier/feeder set and given particular attention to the internal switch.
5.Specific training of personnel who assemble the bridge rectifier/feeder set in order that maximum care is given to the cleanliness of the work area to avoid all contamination of internal switch and plastic part where the internal switch contact is mounted.
Closed bins are also being introduced for stocking and handling of the internal switch contacts and plastic parts to exclude eventual dust or dirt contamination.
6.Introduction of a new test of the bridge rectifier/feeder set for internal switch operation conditions before it is assembled with the coil.
9.The contactors and the spare parts will be immediately packaged in their cartons at the end of the final factory tests.
10.The technical office will proceed with a study to evaluate the eventual need to increase
the compression spring tension of the coil internal switch.
11.The number of regular product audits will be increased by Product Quality Control personnel.The audits will include a greater number of controls to have a in-depth product analysis.
12.A modification has been introduced on the faston terminal used with the coil wires (the ones which connect the coil with the bridge rectifier/feeder set to provide better mechanical resistance to the connections.
8.For spare parts,an in-depth test is made and will include:
- increased number of coil-feeder set operations
- repeated testing of the bridge rectifier/feeder set
- in addition of normal test procedure,the coil-feeder set will be installed on contactors to check operating conditions.
英语翻译Following up on the reports you issued based on complaints received from your customer of locomotive workshops,ACKE Electric has set up a series of actions with the scope of:1.Impose controls during of the different phase of the coil wind
在这个报道发布基于客户投诉收到你的ACKE电力机车车间,建立了一系列的行动的范围之内.
1.在不同的征收控制相位的线圈去看看确切的尊重的卷线张力和转速的卷线轴上.特别注意也被执行在锡焊操作,包括控制,为正确的温度的焊接.
2.四个方面的电阻测量控制的线圈本身一旦线圈是完整的,所以它扩展到每一件了.这是除了最后的工厂测试完成后在每个接触器总成.
3.人才培养的具体操作和储存这些线圈的储藏室,特别关心进货有条不紊,避免拳法或过度负荷条件下,由于线圈层叠加在同一个垃圾桶.线圈将放置在层,每卷好与其他以避免刮在处理和/或运输.
它也被建立,可立即隔离任何线圈已经下降或接收吹在处理,在一个受控的方式为额外的控件或拒绝.
4.定期审核生产流程的桥式整流/馈电设置和给予特别关注的内部开关.
5.特殊的培训人员的组装桥式整流/馈电设置为了得到最大的护理工作区域的整洁,以避免所有的污染和塑料部分内部开关的内部开关触点被安装.
垃圾箱也被关闭了的长袜和处理内部开关接触和塑料零件,以排除最终灰尘的污染.
6.介绍一种新的检测的桥式整流/馈电开关操作条件设定为内部装配前与线圈.
9.这种接触和备件将被立即打包在纸箱末端的最后工厂测试.
10.技术办公室将会进行了研究,评估最终需要增加
压缩弹簧的拉力线圈内部开关.
11分.这个数目的常规产品审核将增加产品的质量控制人员.审核将包含更多的控制,产品有深入的分析.
12.介绍了改性的faston终端使用线圈的电线(那些连线圈的桥式整流/馈电准备提供更好的机械阻力与连接.
8.为备件、深入的测试,包括:
coil-feeder——增加集合操作
——反复试验的桥式整流/馈电设置
除了正常的——coil-feeder组的测试程序,将被安装在承包商检查操作条件.