英语翻译SUMMARYAn audit was carried out at the GUANGZHOU DOCKYARDS CO.LTD on 28th and 29thSeptember 2010 behalf of BW Shipping,Singapore to determine the level of HSESstandards and HSES performance of the yard.The scope of the audit included veri
来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/19 12:37:46
英语翻译SUMMARYAn audit was carried out at the GUANGZHOU DOCKYARDS CO.LTD on 28th and 29thSeptember 2010 behalf of BW Shipping,Singapore to determine the level of HSESstandards and HSES performance of the yard.The scope of the audit included veri
英语翻译
SUMMARYAn audit was carried out at the GUANGZHOU DOCKYARDS CO.LTD on 28th and 29thSeptember 2010 behalf of BW Shipping,Singapore to determine the level of HSESstandards and HSES performance of the yard.The scope of the audit included verification of requirements as defined in:
英语翻译SUMMARYAn audit was carried out at the GUANGZHOU DOCKYARDS CO.LTD on 28th and 29thSeptember 2010 behalf of BW Shipping,Singapore to determine the level of HSESstandards and HSES performance of the yard.The scope of the audit included veri
概述:2010年9月28和29日在广州中船远航船坞有限公司,代表新加坡BW Shipping有限公司进行了审计,以确定该船坞的HSES 水准和HSES性能.审计范围包括验证如……中规定的要求.
SUMMARYAn审计工作在广州造船厂有限公司28日和29thSeptember2010年代表新加坡BW航运,确定HSESstandards和HSES性能的审计yard.The范围包括核查的要求所界定的水平:
摘要: 2010年9月28至29日,新加坡BW航运公司的代表对广州造船有限公司进行了一次评审以确定该船厂的HSES标准的等级和执行HSES的表现。评审的范围按照。。。。。定义的审核要求进行。