surveyor
来源:学生作业帮助网 编辑:六六作业网 时间:2024/11/14 11:33:50
surveyorsurveyorsurveyorsurveyorassay测量法surveyorassay测量法surveyorassay测量法surveyorassay测量法surveyorassa
surveyor
surveyor
surveyor
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor assay
测量法
surveyor
chief quantity surveyor是什么意思
non exclusive surveyor是什么意思
non exclusive surveyor是什么意思
quantity surveyor 在新西兰就业好么?`RT
请翻译:shipped loose; marine warranty surveyor.
Leak Surveyor(LS512)型气体检测仪是内置泵还是外置?
In 2000,the Mars Global Surveyor photographed cracks on the surface of Mars.
quantity surveyor的意思quantity 是否就是中国的造价工程师或预算员?不是的话那是中国的什么职位呢?
英语翻译Final at discharge port by CIQ/independent surveyor,weighing by draft of scale survey in Seller's option.
英语翻译QUANTITY/CONDITION/WEIGHT/ANALYSIS TO BE FINAL AT TIME AND PLACE OF LOADING BASIS SHORE SCALES,AS PER OFFICAL CERTIFICATES ISSUED BY A FIRST CLASS SURVEYOR.
英语翻译After design ,approval ,planning ,legal and environmental considerations have been addressed alignment of the road is set out by a surveyor.
英语翻译The attending surveyor of the Classification Society will not verify the application of the coatings but will review the reports of the coating inspectors to verify that the specified shipyard coating procedures have been followed.
英语翻译Confirmation of anydisclosures(if you wish to send this information confidentially then pleasewrite to RICS Regulation,Surveyor Court,Westwood Way,Coventry,CV48JE)Witness my hand,thisDay ofEmployerany charge or conviction ofa criminal off
航海英语The document on a vessel,annually endorsed by an American Bureau of Shipping surveyor is called the ______.A.Certificate of Inspection B.Classification CertificateC.Load Line Certificate D.Seaworthy Certificate现在就不知道是B 还
英语翻译I am a qualified Commercial Quantity Surveyor / Civil Engineer with an exceptional track record in managing large infrastructures and building constructions ,as well as hands on technical expertise in the same,seeking a senior techno-mana
英语翻译The other 5% payment for goods must be paid by letter of credit after presentation of certificate of analysis by designated independent surveyor upon quality analysis at Pomalaa unloading port,which is within 30 days after bill of lading
英语翻译1.Any claim by the Buyers on the goods shipped shall be filed within 30 days after the arrival of the goods at the port of destination and supported by a survey report issued by a surveyor approved by the Sellers.2.In the absence of your