帮忙一道英文的system analysis的填空题In unit testing one module may need to call another module which may not be coded yet.In this case the programmer may code a ____module which simulates the results of the actual module.
来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/20 03:20:29
帮忙一道英文的system analysis的填空题In unit testing one module may need to call another module which may not be coded yet.In this case the programmer may code a ____module which simulates the results of the actual module.
帮忙一道英文的system analysis的填空题
In unit testing one module may need to call another module which may not be coded yet.In this case the programmer may code a ____module which simulates the results of the actual module.
帮忙一道英文的system analysis的填空题In unit testing one module may need to call another module which may not be coded yet.In this case the programmer may code a ____module which simulates the results of the actual module.
previous(个人感觉应该是advance,预先的,但这里前面是a,不是an)
在单元测试模型中,有时需要调用另一个模型(可能尚未编制),遇到这种情况,程序员要预先编好一个能运算处理实际模型的程序.
fake.在单元测试中,一个module可能会call另一个还没有编写完成的module。所以我们需要一个???(我猜是fake)module来模拟真实module的结果