商务会议记录英语
后续@@供应量可确保提供**1oz 60~80T/月,但幅宽需提前规划及通知.
2007年6月以后@@将可提高张家港厂出货比例.
交期部分:
五月交期已经确认完毕.其中1280mm 5T 张家港现有4.2T库存随时可以交货,5.8T 预计5/15可交货.
六月60T 交期及价格 5/11回覆.
铜箔卷重:
原来铜箔每卷卷重325KG,现在为利于@@更好配合我司作业,并利于节约@@包装成本,@@将评估及回覆每卷卷重可否增加到400KG.
包装木箱回收待**确认厂内作业流程后回覆.
如果@@后续供应量及品质能够保持稳定,我司将考虑增加或调整HOZ铜箔采购比例.
DSTF 铜箔(型号:TWB-YE) @@ 可正常供货,规格1/3~6 oz ,价格与普通铜箔一致,min.order 1.5T无max.量限至但需提供forecast,@@需提供 Licence NO.
For Lead Free Process @@将针对样品进行解析并回覆结果.
商务会议记录英语后续@@供应量可确保提供**1oz 60~80T/月,但幅宽需提前规划及通知.2007年6月以后@@将可提高张家港厂出货比例.交期部分:五月交期已经确认完毕.其中1280mm 5T 张家港现有4.2T库存
好的没问题!请问一下@@是什么意思啊?不然翻不出来
@ @ Follow-up supply to ensure the provision of **1oz 60~80T/,However,the width required advance planning and notification.June 2007 after @ @ Zhangjiagang will improve plant output ratio.Some pay period :May pay period has been confirmed.1280m 5T which enables existing 4.2T deliver the stock at any time,prepare annual investment plans 11/11 5.8T is expected to be delivered.60T pay period in June and price 5/11 back.Volume heavy copper foil :the original copper foil every 325KG important thing now for the benefit of @ @ Division I with a better operation,@ @ conducive to saving and packaging costs.@ @ response will be assessed and every thing important to inform 400KG.wooden box packaging recycling plant to be operational ** confirmation process After back.@ @ Follow-up if the supply and quality will remain stable,the Division will consider increasing or adjustment HOZ copper foil procurement ratio.DSTF Copper Foil (Model :TWB-YE) @ @ Availability can be normal,specifications 1/3~6 oz.copper prices and the general consensus,min.No order 1.5T max.but the quantity is limited to providing forecast.@ @ providing License NO.For Lead Free Process @ @ will target samples for the analysis and response results.
过我分哦
@ @ Follow-up supply to ensure the provision of **1oz 60~80T/, However, the width required advance planning and notification. June 2007 after @ @ Zhangjiagang will improve plant output ratio. Some pay...
全部展开
@ @ Follow-up supply to ensure the provision of **1oz 60~80T/, However, the width required advance planning and notification. June 2007 after @ @ Zhangjiagang will improve plant output ratio. Some pay period : May pay period has been confirmed. 1280m 5T which enables existing 4.2T deliver the stock at any time, prepare annual investment plans 11/11 5.8T is expected to be delivered. 60T pay period in June and price 5/11 back. Volume heavy copper foil : the original copper foil every 325KG important thing now for the benefit of @ @ Division I with a better operation, @ @ conducive to saving and packaging costs. @ @ response will be assessed and every thing important to inform 400KG. wooden box packaging recycling plant to be operational ** confirmation process After back. @ @ Follow-up if the supply and quality will remain stable, the Division will consider increasing or adjustment HOZ copper foil procurement ratio. DSTF Copper Foil (Model : TWB-YE) @ @ Availability can be normal, specifications 1/3~6 oz. copper prices and the general consensus, min. No order 1.5T max. but the quantity is limited to providing forecast. @ @ providing License NO. For Lead Free Process @ @ will target samples for the analysis and response results.