英语翻译提示!**SEA 战略环境影响评价 EIA 环境影响评价 **Programmatic environmental assessment:Evaluates group of action related geographically or having similarities of project type,timing or technological character.These forms are
来源:学生作业帮助网 编辑:六六作业网 时间:2024/12/23 03:36:40
英语翻译提示!**SEA 战略环境影响评价 EIA 环境影响评价 **Programmatic environmental assessment:Evaluates group of action related geographically or having similarities of project type,timing or technological character.These forms are
英语翻译
提示!
**SEA 战略环境影响评价 EIA 环境影响评价 **
Programmatic environmental assessment:Evaluates group of action related geographically or having similarities of project type,timing or technological character.
These forms are developed keeping in view various national and institutional developments of evaluation tools according to particular policy making and planning processes and needs.It would be pertinent here to mention similarities and differences between the two processes of EIA and SEA.Difference between SEA and EIA:SEA and EIA have similar objectives and are complementary to one another as can be seen through various levels of Bering (Fig.1).SEAS are applied at the PPP level prior to more detailed EIA,which is applied at the individual project level.SEA greatly reduces numbers and scope of EIAs that need to be carried out at any stage of the planning process.Once SEA has been prepared,specific projects that come under the scope of PPP can be assessed.
SEA and EIA differs fundamentally in scope and nature of their approach,EIA is carried out once a policy has already been decided.It is an exercise,which provides information about the likely environmental impacts of any individual project and can be useful in identifying necessary mitigation measures.The difference between the two processes is also evident from the scale of frameworks.The framework within which SEA is carried out is much larger than EIA and allows consideration of alternatives and a better view of a much "bigger picture".Example:If a government decides for various economic and diplomatic reasons to meet the rising energy demands by means of increased use of nuclear power,EIA can be used to help minimize the environmental damage.However,it cannot be used to address the fundamental question of whether there is anything sustainable about building nuclear power stations or not.A system of SEA would ensure that not only would the economic and social impacts of different energy policies be taken into account but also the input on all significant environmental variables would be considered.
英语翻译提示!**SEA 战略环境影响评价 EIA 环境影响评价 **Programmatic environmental assessment:Evaluates group of action related geographically or having similarities of project type,timing or technological character.These forms are
这是我自己翻译的,当然也查找了一些词组,但是绝对没有把SEA翻译成大海的现象.看看吧.
纲领性的环境评价:总体评价环境在地理方面和具有相似类型项目的特点耗时及技术含量相关.
这些评价规范的产生是发达国家着眼于制度的发展而制定的评价工具,而这些工具是根据特定的政策和规划过程及需求而形成的.这里所说的有关两种评价标准EIA及SEA就和这种评价形式有关联.SEA与EIA的区别就是虽然两者有着共同的作用,但是他们也是互补的,这可以从白令海峡质量等级看出来.SEA是应用在PPP等级上的,就是更优先于繁琐的EIA,因为EIA是应用在个人项目水平上的.SEA很大程度上减少了编号和EIA的范围,EIA总是需要在任何计划的过程中执行每一个步骤.一旦SEA准备好,在PPP范围下的特定项目就可以被评估了.
SEA和EIA根本性的不同之处在于他们所触及的范围和性质.EIA是一旦某个政策要决定执行了它就开始实施.这是一种提供类似环境问题的方法,任何个人的项目任务都是可以鉴定是否要采取必要的环节措施.这两种评价检测的方法也很明显的在框架规模的大小中显现出来.SEA的框架总是比EIA执行的范围大,它允许考虑选择一个更好的或是一个更大的范围.例如:如果一个政府决定为各种各样的经济和外交上的原因,以满足日益增长的能源需要而就此增加核能量的使用,这时EIA就可以帮助减少环境污染而带来的伤害.然而,它不能用来解决根本性的问题:是否建立核电站与可持续发展有关.SEA系统不但可以影响不同能源政策所带来的经济及社会影响是否应该被慎重考虑,而且是所有重大环境变化被审视的推动力.
你付费吧,我帮你人工翻译,保证质量
环境评估:评估小组的纲领性的行动或具有的相似性有关地理项目类型、时间和技术特点。
这些表格是发达国家的各项摘要着眼于和制度等方面的评估工具,根据具体政策制定的计划过程和需求。它会是有关这里提到的异同以及这两种过程的环境影响评价。区别和环评:海洋和海洋环境影响评价也有类似的目标,并且彼此互补,可以看出通过各级白令海(图1)。海是应用在购买力平价水平前,环境影响评价,这是更详细应用在个别项目的...
全部展开
环境评估:评估小组的纲领性的行动或具有的相似性有关地理项目类型、时间和技术特点。
这些表格是发达国家的各项摘要着眼于和制度等方面的评估工具,根据具体政策制定的计划过程和需求。它会是有关这里提到的异同以及这两种过程的环境影响评价。区别和环评:海洋和海洋环境影响评价也有类似的目标,并且彼此互补,可以看出通过各级白令海(图1)。海是应用在购买力平价水平前,环境影响评价,这是更详细应用在个别项目的水平。海大大降低编号和范围EIAs需要执行的任何阶段规划过程。一旦海已经准备好了,来的具体项目范围内的购买力平价(PPP)可评估。
海洋和环境影响评价在范围和性质不同的根本方法、环境影响评价是进行了一次政策已被决定。这是一种运动,它提供的信息可能个别项目环境影响,有助于鉴别必要的缓解措施。这两个过程之间的区别,可以明显地从规模的框架。这个架构,使海是进行了非常大的环境影响评价,并允许考虑选择与一个更好的看法的一个相当“更大的图片”。例如:如果一个政府决定为各种各样的经济和外交上的原因,以满足日益增长的能源需求而被意味着越来越多的人使用核能,环境影响评价可以用来帮助减少环境污染。然而,它不能被用来解决这一根本性的问题是否有任何可持续关于建立核电站。一个系统的海洋将确保不但会经济和社会影响的不同的能源政策被考虑,但als无关
收起
即使是中文的也看不下去啊 更别说是英文的了
晕了,这么大一篇文章???建议你还是从网上找个翻译软件吧,个人翻译的话难免会有误差,一个单词包含着不同的含义和用法,而语法也是千变万化的,所以还是用翻译软件比较理想。