英语翻译pressure testing should be carried out on all equipment to the maximum pressure specified company/program,before any well effluent is allowed to enter the Well Test package.It is carried out in order to ascertain the integrity of all flow
来源:学生作业帮助网 编辑:六六作业网 时间:2024/11/22 02:16:42
英语翻译pressure testing should be carried out on all equipment to the maximum pressure specified company/program,before any well effluent is allowed to enter the Well Test package.It is carried out in order to ascertain the integrity of all flow
英语翻译
pressure testing should be carried out on all equipment to the maximum pressure specified company/program,before any well effluent is allowed to enter the Well Test package.It is carried out in order to ascertain the integrity of all flowlines,vessels etc.
英语翻译pressure testing should be carried out on all equipment to the maximum pressure specified company/program,before any well effluent is allowed to enter the Well Test package.It is carried out in order to ascertain the integrity of all flow
在任何井流出物被允许进入试井装置容器之前,所有的设备都应该通过指定的最大压力测试公司/机构进行压力测试,以确保所有管路和容器的完好(完整性).
因为你没有给上下文,我猜测了一下估计是写石油开发时的压力测试问题。
压力测试必须于流出物被允许进入试井方案之前,在各种明确规定的公司或者程序设备下进行最大值测试。压力测试是为了确定水下出油管线和容器的完整性。
以上是来自蔡老师的专业回答,如有问题,欢迎交流讨论!
----------------------------------------------蔡氏招牌,成就未来-...
全部展开
因为你没有给上下文,我猜测了一下估计是写石油开发时的压力测试问题。
压力测试必须于流出物被允许进入试井方案之前,在各种明确规定的公司或者程序设备下进行最大值测试。压力测试是为了确定水下出油管线和容器的完整性。
以上是来自蔡老师的专业回答,如有问题,欢迎交流讨论!
----------------------------------------------蔡氏招牌,成就未来--------------------------------------------------
收起
在任何好的产出物(子程序)进入良好的测试程序包之前,都应该对所有配置进行压力测试,使指定的组件(这里是不是components)/程序实现最大化压力测试。压力测试是为了确保流程线、容器的完整性。
压力试验应在所有设备指定的公司/程序的最大压力下进行,在任何井流出物被允许进入测试包。它是进行以确定所有管线的完整性